SEMI E68 - Test Method for Determining Warm-Up Time of Mass Flow Controllers -

Member Price: $138.00
Non-Member Price: $180.00

Volume(s): Equipment Automation Hardware
Language: English
Type: Single Standards Download (.pdf)
SEMI Standards Copyright Policy/License Agreements

Revision: SEMI E68-0997 (Reapproved 0913) - Inactive

Revision

Abstract


NOTICE: This Standard or Safety Guideline has an Inactive Status because the conditions to maintain Current Status have not been met. Inactive Standards or Safety Guidelines are available from SEMI and continue to be valid for use.

 

The purpose of this method is to provide a standardized method for quantifying the warm-up time of a mass flow controller (MFC).


The test conditions in this method are intended to simulate bench top warm-up, with an MFC that has been equalized to ambient conditions for 24 hours before the application of power.

 

Referenced SEMI Standards (purchase separately)

None.

 

Revision History

SEMI E68-0997 (Reapproved 0913)

SEMI E68-0997 (Reapproved 0309)

SEMI E68-0997 (Reapproved 1103)

SEMI E68-0997 (first published)

Interested in purchasing additional SEMI Standards?

Consider SEMIViews, an online portal with access to over 1000 Standards.

Refund Policy: Due to the nature of our products, SEMI has a no refund/no exchange policy. Please make sure that you have reviewed your order prior to finalizing your purchase. All sales are final.